Prepare the supporting documents

Prepare an electronic copy of the requisite documents as PDF files or photograph each page of the documents with your cell phone.

The invoices must indicate that the amount was paid. Plans and specifications and bids are not accepted as proof of purchase or proof of the completion of the work.

Date of eligible expenses

To be eligible for financial assistance, the charging station must have been acquired and installed while the program is in effect.

Expenses incurred between February 1, and March 31, 2025—during the temporary suspension of the program—are not be eligible for financial assistance.

Check the transaction date and installation date indicated on your invoices before submitting your grant application.

Information on the vehicle

The following supporting documents and information related to your vehicle are required:

  • the vehicle identification number (VIN) (no supporting document is required);
  • the “Service received” document submitted when the vehicle was registered with the Société de l’assurance automobile du Québec (SAAQ) or the registration certificate.

Proof of purchase or leasing of your charging station

The invoice for your charging station or leasing contract must include the following information:

  • your name and home address;
  • the date of the transaction;
  • the name or corporate name and contact information of the supplier;
  • a detailed description of the items covered by the transaction;
  • the amount of each item covered by the transaction and the total amount of the transaction, including taxes and other applicable fees;
  • in the case of a leasing contract, the monthly payments and the total amount spent at the conclusion of the leasing period.

If you made your purchase online, this information may be found in several documents. Be sure to submit with your application all the required documents.

Proof of the installation of your charging station

The invoice for the installation performed by an electrician must include the following information:

  • your name;
  • the home address where the work was performed;
  • the date of the installation;
  • the name of the electrical contractor;
  • the contractor’s RBQ licence number;
  • the detailed cost of the installation work (including the cost of each item covered by the transaction) and the total amount of the transaction (including taxes and other applicable fees).

If your charging station allows for both level 1 and level 2 charging, the proof of the installation must indicate that the voltage is suitable for a level 2 charging station.

Exception – An invoice for installation work is not required

If you already had a 240-volt outlet outside your dwelling or in your garage, you perhaps do not need an electrical contractor to install your charging station.

In this specific case, you must submit one or more photographs as proof of the installation of the charging station.

The photographs must include a view of the installed charging station and the 240-volt outlet, an overview of your dwelling, and the door number.

However, if the cost of purchasing or leasing your charging station does not exceed $600, your application will be inadmissible.


Previous



Next


Last update: April 28, 2025

Page evaluation
Please complete the reCAPTCHA verification.

Was the information on this page helpful?

Why was this information unhelpful?

You must select an option

What issue are you experiencing?

You must select an option

Why was the information useful?

Please describe the problem